Nmrv075 0.75kw Worm Gearbox with Motor

Nmrv075 0.75kw Worm Gearbox with Motor

RV series Qualities

  • RV – Sizes:030-040-050-063-075-a hundred and five-110-a hundred thirty-a hundred and fifty
  • Input Options: with input shaft, With Square flange,With Enter Flange
  • Input Power .06 to 11 kW
  • RV-Measurement from 030 to 105 in die-forged aluminium alloy budy and over one hundred ten in forged iron
  • Ratios amongst five and 100
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium units are supplied complete with synthetic oil and allow for common mounting positions, with no need to have to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Measurement 030 and in excess of are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, reduced/substantial temperature oil, filling/drain/breather/level plug,Small gap

Simple models can be applied to a wide variety of energy reduction ratios from five to one thousand.
Guarantee: One year from date of supply.

 

WORM GEARBOX          
SNW SERIES          Output Velocity Variety:
Sort Aged Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine Push

ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a point out-owned military mould business, was proven in 1965. CZPTshine specializes in the full electricity transmission resolution for higher-finish products manufacturing industries dependent on the goal of “System Item, Software Design and Specialist Support”.
CZPTshine have a sturdy technological pressure with in excess of 350 workers at present, like above thirty engineering technicians, 30 quality inspectors, covering an region of 80000 sq. meters and kinds of superior processing machines and screening equipments. We have a excellent foundation for the sector application development and service of higher-end pace reducers & variators owning to the provincial engineering engineering investigation center,the lab of equipment speed reducers, and the foundation of modern day R&D.

Our Staff

High quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

Nmrv075 0.75kw Worm Gearbox with Motor

Tags:

Recent Posts